Exciting Updates

9 April 2024

Construction of our new, high-tech composting facility at Gilmore is gaining momentum. Here’s what we’ve been up to lately:

  • Finished the culvert and creek crossing
  • Completed site excavation, including stripping and compacting
  • Constructed and lined the compost run-off dam
  • Installed the power supply transformer
  • Poured the slab for our storage shed and Gross Pollution Trap (GPT)

Next up we’ll be building the storage shed, installing the required weather station, and assembling the Modular Aerated Floor (MAF) Composting system.