Preliminary design presented
Work on the Brindabella Road survey and design continues to move forward. In early September our Assets team met with the contractor for presentation and discussion of the preliminary design.
Share Preliminary design presented on Facebook
Share Preliminary design presented on Twitter
Share Preliminary design presented on Linkedin
Email Preliminary design presented link
Consultation has concluded