Adelong Aquatic Centre Water Temperature Regulation
Share Adelong Aquatic Centre Water Temperature Regulation on Facebook
Share Adelong Aquatic Centre Water Temperature Regulation on Twitter
Share Adelong Aquatic Centre Water Temperature Regulation on Linkedin
Email Adelong Aquatic Centre Water Temperature Regulation link
Background
Funding of $78,945 was allocated from the second round of the NSW Government's Stronger Country Community Fund to design and install mechanisms to regulate the water temperature of Adelong Pool.
The Project
The project includes construction of a shelter on the pool grounds and installation of solar panels on the structure’s roof to increase water temperatures; and installation of rollers and pool blankets to help regulate the water temperature.
Project completed in July 2020 and we look forward to warmer water temperatures this summer swim season.