Rail Removal Trial
Approximately 200m of rail and sleepers were successfully removed from a section of the rail trail as part of a trial run to see what removal processes were practical and efficient.
An air-compressor driven rattle gun was used to remove some heavily rusted and corroded nuts and bolts holding the lines together, and an excavator with grab attachment was the successful method used to remove the rails.
Share Rail Removal Trial on Facebook
Share Rail Removal Trial on Twitter
Share Rail Removal Trial on Linkedin
Email Rail Removal Trial link
Consultation has concluded