Adelong Creek Riparian Stabilisation Work

Share Adelong Creek Riparian Stabilisation Work on Facebook Share Adelong Creek Riparian Stabilisation Work on Twitter Share Adelong Creek Riparian Stabilisation Work on Linkedin Email Adelong Creek Riparian Stabilisation Work link

Council has secured funding from the NSW Severe Weather and Flood Grant, provided by the NSW Office of Local Government, to clear debris along Adelong Creek’s public recreation areas and to design and repair the creek bank, reducing erosion and protecting native wildlife habitats.

The work will focus on two areas along the creek, one at the Bleak Street end of Selwyn Street and another behind the Adelong Showgrounds.

Planned works include:

  • Strengthening the creek bank with large timber and/or rock to prevent further erosion
  • Removing invasive plants and restoring native vegetation
  • Improving water quality and habitat for native wildlife
  • Making the area safer and more visually appealing
  • Providing better protection against minor flood events

Council has engaged NSW Soil Conservation Service (SCS) to carry out the works.

Council has secured funding from the NSW Severe Weather and Flood Grant, provided by the NSW Office of Local Government, to clear debris along Adelong Creek’s public recreation areas and to design and repair the creek bank, reducing erosion and protecting native wildlife habitats.

The work will focus on two areas along the creek, one at the Bleak Street end of Selwyn Street and another behind the Adelong Showgrounds.

Planned works include:

  • Strengthening the creek bank with large timber and/or rock to prevent further erosion
  • Removing invasive plants and restoring native vegetation
  • Improving water quality and habitat for native wildlife
  • Making the area safer and more visually appealing
  • Providing better protection against minor flood events

Council has engaged NSW Soil Conservation Service (SCS) to carry out the works.

  • Work Progresses to Showground Site

    Share Work Progresses to Showground Site on Facebook Share Work Progresses to Showground Site on Twitter Share Work Progresses to Showground Site on Linkedin Email Work Progresses to Showground Site link
    supporting image

    28 April 2026

    Creek stabilisation works at Bleak Street are now complete. Rocks and timber logs have been installed to strengthen the creek bank, while also enhancing water quality and providing improved habitat for native species. Invasive vegetation along the upper creek bank has been cleared and will be replaced with appropriate native species following winter.

    Works have now commenced at the Showground site, where similar stabilisation measures will be undertaken. Selected timber removed from Bleak Street will be repurposed to assist with access into the waterway at the Showground.

    28 April 2026

    Creek stabilisation works at Bleak Street are now complete. Rocks and timber logs have been installed to strengthen the creek bank, while also enhancing water quality and providing improved habitat for native species. Invasive vegetation along the upper creek bank has been cleared and will be replaced with appropriate native species following winter.

    Works have now commenced at the Showground site, where similar stabilisation measures will be undertaken. Selected timber removed from Bleak Street will be repurposed to assist with access into the waterway at the Showground.

  • Works Now Underway

    Share Works Now Underway on Facebook Share Works Now Underway on Twitter Share Works Now Underway on Linkedin Email Works Now Underway link
    supporting image

    19 March 2026

    Thanks to everyone who joined our recent information session about the Adelong Creek Repair Works. We had great conversations with NSW Soil Conservation and received lots of positive feedback from the community.

    Work has now begun removing exotic vegetation from the top side of the creek bank at Bleak Street. This is the first stage of works to strengthen the bank and help prevent erosion, before the project moves into the creek itself.

    Works on site are expected to continue over the coming months.

    19 March 2026

    Thanks to everyone who joined our recent information session about the Adelong Creek Repair Works. We had great conversations with NSW Soil Conservation and received lots of positive feedback from the community.

    Work has now begun removing exotic vegetation from the top side of the creek bank at Bleak Street. This is the first stage of works to strengthen the bank and help prevent erosion, before the project moves into the creek itself.

    Works on site are expected to continue over the coming months.

  • Creek Works to Begin in March

    Share Creek Works to Begin in March on Facebook Share Creek Works to Begin in March on Twitter Share Creek Works to Begin in March on Linkedin Email Creek Works to Begin in March link
    supporting image

    17 February 2026

    Riparian stabilisation works along Adelong Creek will being in March, following the completion of the Review of Environmental Factors (REF) and design work by NSW Soil Conservation Service (SCS).

    The project aims to:

    • Stabilise creek banks and prevent erosion
    • Protect local biodiversity and water quality
    • Improve visual amenity and safety

    Project locations:

    • Bleak Street: (near the end of Selwyn Street) northern bank
    • Adelong Showgrounds: northern bank and mid-channel

    Works include:

    • Site setup and erosion controls
    • Delivery of rock and large logs for bank reinforcement
    • Removal of exotic vegetation and on-site mulching
    • Grading, stabilisation, and revegetation with native plants

    Community Info Session:
    📅 Thursday 26 Feb, 3:30 – 5 pm
    📍 Bleak Street site
    Council’s Project Manager and SCS representatives will be on-site to answer questions.

    17 February 2026

    Riparian stabilisation works along Adelong Creek will being in March, following the completion of the Review of Environmental Factors (REF) and design work by NSW Soil Conservation Service (SCS).

    The project aims to:

    • Stabilise creek banks and prevent erosion
    • Protect local biodiversity and water quality
    • Improve visual amenity and safety

    Project locations:

    • Bleak Street: (near the end of Selwyn Street) northern bank
    • Adelong Showgrounds: northern bank and mid-channel

    Works include:

    • Site setup and erosion controls
    • Delivery of rock and large logs for bank reinforcement
    • Removal of exotic vegetation and on-site mulching
    • Grading, stabilisation, and revegetation with native plants

    Community Info Session:
    📅 Thursday 26 Feb, 3:30 – 5 pm
    📍 Bleak Street site
    Council’s Project Manager and SCS representatives will be on-site to answer questions.

Page last updated: 28 Apr 2026, 01:45 PM